Installation of Watch Tower

PROJECT NAME: THE KANCHPUR,MEGHNA & GUMTI 2ND BRIDGES CONSTRUCTION AND EXISTING BRIDGE REHABILITATION PROJECT, BANGLADESH.
FABRICATION , ERECTION & INSTALLATION OF  WATCH TOWER 16 NOS
Main Contractor  : OSJI Joint Venture, Japan
Sub Contractor    : Rafi Engineering & Construction.
Duration : 2017

PROJECT DETAILS

Project: Watch Tower
Location: Bangladesh
Main Contractor: OSJI Joint Venture, Japan
Sub-Contractor: Rafi Engineering & Construction
Duration: 2017